esempi
  • Other contracts were placed on hold in phases VII and VIII that could have added generating capacity of some 2,000 megawatts had they been processed. They were for new gas- and steam-powered generating stations, and some of them are on hold and some are registered.
    تم تعليق عقود أخرى في المرحلتين السابعة والثامنة كان يمكن في حالة تنفيذها أن تضيف قدرات توليدية تقدر بـ (000 2) ميغا واط تتضمن محطات توليد غازية وبخارية جديدة قسم منها معلق والآخر مسجل.