أمثلة
  • after a single fall without packing from a height of no more than 1 m; after a single fall in packing from a height of 1.5 m onto any surface (ground, concrete, rails, steel plate); during and after the effect of short-term acceleration, for example, during air drops.
    تتم عملية تجهيز الذخائر بصمامات التفجير بلولبة الصمام المناسب بتجويف الصمام وتثبيته به.